Skip to content

AH-NFM-ACT-01 · Action

Record Condition

A consistent first-stage recording method for those who need to decide whether to monitor, escalate or commission specialist assessment.

Under technical reviewAH-NFM-ACT-01v1.0Registry revision: May 2026 · review not verified

Independent technical review is pending. Publication does not establish scientific approval.

Under editorial review — PDF not available for public download.

Visual condition record

Record what is visible without touching, testing or treating the object. This is a documentation aid, not a diagnosis, risk rating or treatment recommendation.

Entries stay in this page only; nothing is sent or saved to an account. Export your record before leaving.

Three levels of assessment

  • Level 1 — Observation record. Manager, architect, officer, custodian or non-specialist conservator. Output: dated photographs and observation form.
  • Level 2 — Specialist condition assessment. Appropriately experienced conservator. Output: illustrated report and recommendations.
  • Level 3 — Project investigation and specification. Specialist team as needed. Output: specification, trials, approvals, works record and maintenance plan.

This open resource primarily supports Level 1 and competent commissioning of Levels 2 and 3.

Preparation

Where available, obtain ownership and responsible contact; exact location and access arrangements; designation, listing, scheduling, memorial or collection status; maker, artist, date, design history and intended appearance; previous reports, treatment, coating or maintenance records; known health-and-safety, public-access, height, water, security or structural risks.

Equipment suitable for non-invasive recording: a camera or phone capable of dated high-resolution photographs; a notebook or digital form and asset identifier; a safe scale marker where appropriate without touching the surface; a site plan or location reference; suitable PPE and the site's access arrangements.

This method does not authorise handling, access at height, opening structures, sampling or disturbing surfaces.

Observation sequence

  1. Context — setting, exposure, shelter, nearby water, public contact, adjacent materials.
  2. Asset identity — name, function, location, status, known history.
  3. Probable material — metal family and degree of confidence.
  4. Manufacture / assembly — cast, sheet, fabricated, electrotype, joins, fixings, supports.
  5. Surface — patina, paint, coating, gilding, plating, polish, deposits.
  6. Condition — corrosion appearance, coating failure, cracks, distortion, losses, stains.
  7. Whole assembly — water paths, armature clues, interfaces, adjacent staining, drainage.
  8. Risk and next action — safety, urgency, consent/permission, specialist referral, monitoring date.

Photography standard

Minimum image set: location and context; full elevation; affected area; close detail; interfaces (pedestal, joints, bolts, runoff, adjacent material); identification and significance (marks, inscriptions, maker detail, surviving finish traces).

Use a stable naming convention: AssetID_Date_View_Sequence. Retain original image files, record the photographer and store images with the observation form. Do not rely on images embedded in email alone.

Language

Suitable: 'Probable copper alloy; identification not confirmed.' · 'Green surface is coherent overall; small bright-green powdery points in sheltered fold.' · 'Transparent surface coating appears patchy and lifting.' · 'Vertical split with rust-coloured staining; internal support failure suspected.'

Avoid unless made by a competent specialist: 'Bronze disease' used for any green surface · 'Needs polishing' or 'needs restoring to original colour' without evidence · 'Safe' or 'structurally sound' without appropriate assessment · 'Original finish' where supporting evidence is absent.

Risk categorisation

  • Immediate — public safety or rapid damage. Notify responsible authority; secure safely; commission urgent advice.
  • High — specialist assessment needed before delay or works.
  • Planned — significant concern requiring scoped action.
  • Monitor — no evident active concern; set inspection interval.

Decision record

A condition record is incomplete without a decision trail: who reviewed the observation; what was decided and why; whether specialist advice was commissioned; whether consent or permissions may be required; the action owner and date; when the asset will next be inspected; where all records are stored.

Need project-specific advice?

Arts Heritage is a conservation practice. For advice on a particular asset or proposal, contact Arts Heritage ↗.