Skip to content

AH-NFM-ACT-03 · Action

Plan Maintenance

Maintenance is the means by which avoidable deterioration, unnecessary restoration and expensive crisis work are prevented.

Under technical reviewAH-NFM-ACT-03v1.0Registry revision: May 2026 · review not verified

Independent technical review is pending. Publication does not establish scientific approval.

Under editorial review — PDF not available for public download.

Asset register: the foundation

Each record should include: a unique asset ID; the asset and location; ownership and responsibility; designation or significance; probable material and finish; a baseline condition record; known treatments or repairs; an inspection interval; escalation triggers; and the next action and date.

Risk-based inspection planning

Inspection frequency should be set by significance, vulnerability, exposure, access, recent works and known failure mechanisms — not by applying an arbitrary interval to every asset.

  • Exposure: coastal salts, traffic pollution, water features, sheltered wet recesses.
  • Structural vulnerability: lead statuary, zinc figures, electrotype shells, recorded armature concerns.
  • Public interaction: touch points, climbable sculpture, memorial use, vandalism history.
  • Functional fabric: lead roofs, copper rainwater goods, fountains.
  • Surface maintenance system: waxes, lacquers, paints, coatings.
  • Recent treatment requiring aftercare monitoring.

Inspection checklist

At each planned observation, record: date, inspector, weather and safe access limitations; photographs matching previous viewpoints; change in surface colour, texture, deposits or coating condition; new cracks, splits, movement, distortion, loose or missing elements; staining at fixings, plinths, stonework or run-off routes; water, drainage, plant growth, fouling, debris or nearby works; vandalism, theft or public-safety concern; decision — no change / monitor, planned specialist review, or urgent escalation.

Material-led escalation triggers

  • Bronze, brass, copper. Refer where bright powdery corrosion appears, coatings have failed, repatination or cleaning is proposed, or structural staining is observed.
  • Lead. Refer where there are cracks, rust staining, deformation, movement, roof leakage, or proposals for repainting or movement.
  • Zinc / spelter. Refer where there is fracture, pitting, collapse, plating or paint loss, or armature clues.
  • Electrotype copper. Refer where there is denting, shell crack, movement, failed support or a proposed treatment as if bronze.
  • Aluminium. Refer where there is pitting, a failed weld or fixing, an anodised or paint change, or a replacement proposal.

Post-treatment maintenance record

After any approved conservation intervention, the owner should receive and retain: a final condition record and photographs; description of work and materials used; sample / approval record for changed appearances; known limitations and remaining risks; specified inspection interval; requirements for specialist coating or surface-system review; next review date and responsible party; permissions and completion approvals where relevant.

Maintenance plan template structure

  • Asset identity and significance — what it is and why care matters.
  • Material and surface baseline — what is known and what remains uncertain.
  • Known vulnerabilities — exposure, surface system, support, water, security, prior repair.
  • Routine observation schedule — who records what and at what interval.
  • Specialist inspection schedule — when expert review is required.
  • Escalation triggers — events or observations requiring action.
  • Records management — photographs, reports, decision log, storage location.
  • Budget and responsibility — who commissions and funds foreseeable care.

Need project-specific advice?

Arts Heritage is a conservation practice. For advice on a particular asset or proposal, contact Arts Heritage ↗.