AH-NFM-ACT-03 · Action
Plan Maintenance
Maintenance is the means by which avoidable deterioration, unnecessary restoration and expensive crisis work are prevented.
Independent technical review is pending. Publication does not establish scientific approval.
Asset register: the foundation
Each record should include: a unique asset ID; the asset and location; ownership and responsibility; designation or significance; probable material and finish; a baseline condition record; known treatments or repairs; an inspection interval; escalation triggers; and the next action and date.
Risk-based inspection planning
Inspection frequency should be set by significance, vulnerability, exposure, access, recent works and known failure mechanisms — not by applying an arbitrary interval to every asset.
- Exposure: coastal salts, traffic pollution, water features, sheltered wet recesses.
- Structural vulnerability: lead statuary, zinc figures, electrotype shells, recorded armature concerns.
- Public interaction: touch points, climbable sculpture, memorial use, vandalism history.
- Functional fabric: lead roofs, copper rainwater goods, fountains.
- Surface maintenance system: waxes, lacquers, paints, coatings.
- Recent treatment requiring aftercare monitoring.
Inspection checklist
At each planned observation, record: date, inspector, weather and safe access limitations; photographs matching previous viewpoints; change in surface colour, texture, deposits or coating condition; new cracks, splits, movement, distortion, loose or missing elements; staining at fixings, plinths, stonework or run-off routes; water, drainage, plant growth, fouling, debris or nearby works; vandalism, theft or public-safety concern; decision — no change / monitor, planned specialist review, or urgent escalation.
Material-led escalation triggers
- Bronze, brass, copper. Refer where bright powdery corrosion appears, coatings have failed, repatination or cleaning is proposed, or structural staining is observed.
- Lead. Refer where there are cracks, rust staining, deformation, movement, roof leakage, or proposals for repainting or movement.
- Zinc / spelter. Refer where there is fracture, pitting, collapse, plating or paint loss, or armature clues.
- Electrotype copper. Refer where there is denting, shell crack, movement, failed support or a proposed treatment as if bronze.
- Aluminium. Refer where there is pitting, a failed weld or fixing, an anodised or paint change, or a replacement proposal.
Post-treatment maintenance record
After any approved conservation intervention, the owner should receive and retain: a final condition record and photographs; description of work and materials used; sample / approval record for changed appearances; known limitations and remaining risks; specified inspection interval; requirements for specialist coating or surface-system review; next review date and responsible party; permissions and completion approvals where relevant.
Maintenance plan template structure
- Asset identity and significance — what it is and why care matters.
- Material and surface baseline — what is known and what remains uncertain.
- Known vulnerabilities — exposure, surface system, support, water, security, prior repair.
- Routine observation schedule — who records what and at what interval.
- Specialist inspection schedule — when expert review is required.
- Escalation triggers — events or observations requiring action.
- Records management — photographs, reports, decision log, storage location.
- Budget and responsibility — who commissions and funds foreseeable care.
Need project-specific advice?
Arts Heritage is a conservation practice. For advice on a particular asset or proposal, contact Arts Heritage ↗.
